极品熟妇大蝴蝶20p,国产精品多人P群无码,中国凸偷窥xxxx自由视频妇科,最近中文字幕mv在线资源

中文
Projects
Testing Project of the East-West Expressway in Algeria

The East-West Expressway in Algeria is 1216 kilometers long with six lanes in both directions and is the main traffic artery running through the east-west direction of Algeria. 


Back

Main work undertaken

JSTI conducted testing technical consulting, data control, and inspection and measurement for the entire engineering project by establishing and operating the central laboratory of the general contractor, improving the overall quality control level.


Achievements

Won the 15th China Civil Engineering Zhan Tianyou Award.